HomeResidencesFacilitiesLocationDeveloperPricingContact
The Serra Residences — the 28-storey tower on Bassein Road seen against the Novena skyline, artist's impression

District 11 · 7 Bassein Road

The Serra
Residences

133 freehold homes in one 28-storey tower beside HealthCity Novena. Previews 19 September 2026.

Artist’s impression supplied by the developer. Not a photograph of the completed building.

133
Residences
28
Storeys · one tower
Freehold
Tenure · District 11
51,396
Sqft site
19 Sep
Developer preview

The Development

One freehold tower,
133 homes, beside HealthCity

The Serra Residences stands at 7 Bassein Road, a freehold site in District 11 on the Novena ridge. The land runs to 4,774.8 sqm — about 51,396 sqft at a gross plot ratio of 2.8, and carries a single 28-storey tower of 133 homes over a two-storey carpark, a tennis court and a basement.

The tower is deliberately read as two addresses. Levels 4 to 16 hold the 2-bedroom with study, 3-bedroom and 4-bedroom homes. Levels 18 to 28 — The Summit — hold the larger four- and five-bedroom homes and the two penthouses, each with a private lift from type D4 upward. A sky terrace on Level 17 separates them, and a second one sits on Level 3 above the arrival court.

The developer is Transurban Properties Pte Ltd, and the fact sheet's developer section is Far East Organization's — Singapore's largest private developer, with more than 780 developments and 55,000 private homes delivered since 1960.

The Serra Residences tower on Bassein Road at dusk, artist's impression
Artist’s impression — from the developer’s marketing e-book

How the tower is stacked

From the arrival court to The Summit

LevelWhat is there
L18 – L28The Summit — 4-bedroom to 5-bedroom homes and the two penthouses
L17Sky terrace — Zen Deck, Wellness Garden, Social Lounge, Retreat Lounge
L4 – L162-bedroom with study, 3-bedroom and 4-bedroom homes
L3Facilities deck — 50m lap pool, spa pool, gym, dining room, pavilions
L2Arrival bay, residential carpark and tennis court
B1 & L1Residential carpark
Levels are as set out in the developer’s fact sheet of 28 August 2026. There is no Level 13 unit schedule separate from the L4–L16 register, and the sky terrace on L17 is the break between the two collections.
Facilities plan of The Serra Residences at levels 2 and 3, showing the tennis court and the 50m lap pool
Levels 2 and 3 — developer’s facilities plan

The Address

Novena, and what is being built around it

Bassein Road sits between HealthCity Novena and the Newton fringe, about an eight-minute walk from Novena MRT on the North-South Line. The fact sheet also records a link walk through the NTF Centre for Innovation Healthcare, roughly nine minutes, open around the clock.

Within a few minutes on foot: the National Skin Centre, the National Neuroscience Institute, Ren Ci Hospital, Mount Elizabeth Novena and Tan Tock Seng. Square 2, Velocity @ Novena Square, United Square and Goldhill Plaza are the everyday shopping, and 2 Moulmein Road is under construction as a new lifestyle hub.

Hong Wen School and St. Joseph’s Institution Junior are within one kilometre — checked in both OneMap and MOE’s SchoolFinder, not taken from the brochure.

Common questions

The things buyers ask first

How many units does The Serra Residences have?

133, in a single 28-storey tower on a 51,396 sqft freehold site at 7 Bassein Road. The tower is split in two: Levels 4 to 16 hold the 2-bedroom with study, 3-bedroom and 4-bedroom homes, and Levels 18 to 28 — The Summit — hold the larger 4- and 5-bedroom homes and the two penthouses, with a sky terrace on Level 17 between them.

What are the unit sizes?

From 710 sqft for a 2-bedroom with study to 2,540 sqft for the larger penthouse, across thirteen types. The mix is 39 two-bedroom with study, 39 three-bedroom, 43 four-bedroom, 10 five-bedroom and 2 penthouses.

Is it freehold?

Yes. The Serra Residences is freehold, in District 11. Far East Organization's marketing calls it the first freehold harmonised new launch in the Core Central Region; that is the developer's claim, not an independent finding.

When is it expected to be completed?

The developer's fact sheet gives an estimated TOP of Q4 2030, an expected vacant possession date of 1 September 2031 and expected legal completion of 1 September 2034.

Where exactly is it, and what is the nearest MRT?

7 Bassein Road, Singapore 309837, in District 11 beside HealthCity Novena. Novena station on the North-South Line is about an eight-minute walk, and the fact sheet notes a link walk through the NTF Centre for Innovation Healthcare of about nine minutes. The nearest bus stops are on Balestier Road, about 351m away, and Moulmein Road, about 442m.

Which schools are nearby?

Checked in both OneMap's School Query and MOE's SchoolFinder on 12 September 2026, which agree: Hong Wen School and St. Joseph's Institution Junior are within 1km, and Anglo-Chinese School (Junior), Anglo-Chinese School (Primary), Bendemeer Primary, CHIJ Primary (Toa Payoh), Farrer Park Primary, Kheng Cheng School, Pei Chun Public School and St Andrew's Junior are between 1km and 2km. Both ACS schools are on MOE's list of 12 schools that split Phase 2C into a within-2km and a beyond-2km track from the 2027 registration exercise, so from that exercise this address competes in the same track as homes inside 1km of them.

Is there enough parking?

113 lots in all for 133 homes: 106 residential lots including 5 for EV charging, plus 5 accessible lots and 2 accessory lots, across the basement and the two-storey carpark. There are also 4 motorcycle lots and 23 bicycle lots, and each penthouse has one dedicated lot.

What are the prices?

No price list has been issued. The developer preview is 19 September 2026, on Huttons' pipeline schedule of 10 August 2026, and indicative prices normally follow at preview. Register and I will send the list and the balance units the day they are released.

Are the floor plans final?

No. All eleven plans issued so far are watermarked DRAFT by the developer, and areas are estimates subject to final survey. No penthouse plan has been issued yet. They are published here as issued and will be replaced when the final set arrives.

Preview is 19 September

Register before it opens and I will send the price list the day it is issued, with what is still available after the first weekend.

Chat with Andee